Showing posts with label ƒIterative Waterfall Model. Show all posts
Showing posts with label ƒIterative Waterfall Model. Show all posts

Tuesday, 4 February 2014

 phase of the life cycle of waterfall model


 feasibility study: -  

The main aim of feasibility study is to determine whether it would be financially and technically feasible to develop the product.

ƒ     At first project managers or team leaders try to have a rough understanding of what is required to be done by visiting the client side. They study different input data to the system and output data to be produced by the system.

Monday, 3 February 2014

Different software life cycle models


Many life cycle models have been proposed so far. Each of them has some advantages as well as some disadvantages. A few important and commonly used life cycle models are as follows:

  • ƒClassical Waterfall Model
  • ƒIterative Waterfall Model